FOB Price:Get Latest Price
Port:Xiamen, China
Production Capacity:4000 Sqm/Month
Payment Terms:L/C, T/T
Min. Order:200M2
Marble Slab Product &Project Picture
Product Detail
product name | Cold Emerald Marble slab price | |
slabs | 600up*1800up*20-30mm | |
700up*1800up*20-30mm | ||
1200up*2400up-3200up*20-30mm | ||
Tiles | 305*305mm(12''*12'') | |
300*600mm(12''*24'') | ||
400*400mm(18''*18'') | ||
600*600mm(24''*24'') | ||
Thickness Available | 12, 15, 18, 20, 25, 30mm | |
Cut-to-size | 400*400mm, 600*600mm, 800*800mm or Other Sizes | |
MOQ | 100 SQM per Color | |
Lead Time | 7 to 45 days depending on the order | |
Slab Package | Wooden crate package | |
Tile Package | Wooden frame package |
Recommended Marble Slabs and Tiles Materials
Q1:How long is the lead time?
A1:The time of delivery is about 10~30 after the deposit arrival,also depending on quantity.
Q2:What are your main products?
A2:Our main products are marble, limestone, travertine, onyx, slate, slab,countertop, tile, special molding,architecture stones for project, column, water-jet pattern, 3D-Carving, magic tile, wall tile, mosaic,composite marble tile,fireplaces,cut-to-size,etc. OEM also acceptable.
Q3:Are you a manufacturer ?
A3:Yes,we have own factories located in Fujian.
Q4:Do you also make customized design?
A4:Yes. We can do as per client's requirements.
Q5:How could I get to know how much stone I could load per 20' container?
A5:In Xiamen Port of China, we could load the maximum gross weight of 27 tons into one 20'container. Therefore, how much stone you could load per 20' container depends on the weight limit on the roads or railway of your country. Usually, for America, the quantity per 20' container load is as follows.
3/8" thickness——– 6535 sq.ft.
3/4" thickness——– 3267 sq.ft.
1 1/4" thickness——-2042 sq.ft.
1 1/2" thickness——-1720 sq.ft.
2" thickness————1307 sq.ft.
Q6:How long can my order be finished? How soon can I get my ordered products?
A6:Normally one container order needs 15-30 days.
Transportation duration information:
West European main port: 27 days
Felixstowe / Belfast / South Ampton: 40 days
Dublin: 35days
Western coast of America: about 18 days
Eastern coast of America: about 30 days
Other destinations please email us to get our answer.